Woodside Capital Square Tower 1

The Brief

Woodside Capital Square in Perth’s CBD is home to Woodside Energy’s new 29-storey head office. Woodside had been located at 240 St Georges Terrace, Perth since 2004 and given the age of the existing fit out, the company needed a state-of-the-art base to accommodate their requirements for the future.

This project required ENGIE to deliver a complete copper & fibre structured cabling solution for the 29-floor fit out including all backbone requirements and the build of the Main Communications Room (MCR) incl. cabinets, wall frames, fibre reticulation and pathway management.

The design was completed prior to the tender being awarded to ENGIE with many design changes being implemented during construction due to client and technology updates.

The Solution

The project involved the supply and installation of the complete communications solution for Tower 1. Within the MCR, ENGIE installed 68 Schneider racks complete with hot aisle containment, 10 Schneider wall frames, overhead fibre ducting, overhead basket cable containment, all inter-rack fibre and copper cabling incl. termination, testing and labelling.

The project also included the supply and installation of 212 Schneider racks and 106 Schneider Wall frames for the 53 Floor Telecommunication Rooms (TCRs), field cabling to all floors, fibre and copper backbone cabling from each TCR to the MCR as well as backbone voice cabling to each TCR from the local FD.

The Benefit

ENGIE worked closely with Multiplex, NDY, Melchor and Woodside to deliver the complex solution on time and within budget. Due to a timeline that was compressed from 12 to 9 months, many challenges had to be overcome particularly in regard to product procurement. Strong vendor relationships and experience in delivering large projects enabled ENGIE to fast-track procurement and meet project milestones.

The project saw approximately 100 staff engaged on site by ENGIE at its peak. Over 1.5 million meters of copper cabling was installed for this project.
CJ-0467 ENGIE project slider background
NECA State Award for Voice/Data Installation – Project Category
Build of the Main Communications Room (MCR)
Deliver a complete copper & fibre structure cabling solution for the 29-floor fit out

Contact Us

If you need an electrical partner capable of installing millions of metres of cabling, hundreds of racks and hundreds of wall frames within tight deadlines, then get in touch today to find out how we can achieve just that.




    Projects

    High-tech mobile learning centre for the University of Tasmania
    High-tech mobile learning centre for the University of Tasmania
    Tasmania
    We worked with the University of Tasmania to develop an innovative mobile learning vehicle to bring state-of-the-art education to regional Tasmania.
    Springfield Hyundai’s 10-year energy agreement
    Springfield Hyundai’s 10-year energy agreement
    Greater Springfield
    We’ve signed a new 10-year energy agreement with Springfield Hyundai to drive the transition to green energy consumption at the site and provide operational cost savings.

    Knight Frank Solar
    Knight Frank Solar upgrade
    Melbourne, Victoria
    Solar PV upgrade supports first 6-star NABERS rating for a Victorian commercial building
    Commonwealth Bank Solar
    Commonwealth Bank National Solar Rollout
    Various locations across Australia
    ENGIE is helping CBA meet their target to achieve 100% zero net carbon emissions by 2030
    Porsche Solar
    Solar-powered EV charging infrastructure for Porsche
    Melbourne, Victoria
    Solar-powered EV charging infrastructure for Porsche
    Springfield Tower’s Solar Rooftop System
    Springfield Tower's Solar Rooftop System
    Greater Springfield, QLD
    Our ENGIE Better Cities team have delivered the first solar rooftop system on the Springfield Tower in Greater Springfield, as part of our 50-year Strategic Alliance to become a net-zero energy city.
    Tanderrum Bridge Electrical Fitout
    Tanderrum Bridge Electrical Fitout
    Melbourne, Victoria
    Tanderrum Bridge was part of Stage 2 of the Melbourne Park Redevelopment, which was designed to provide an unbroken pedestrian link from Flinders Street Station to Melbourne Park.
    Frankston Civic Centre Multi-Technical Upgrade
    Frankston Civic Centre Multi-Technical Upgrade
    Frankston, Victoria
    Frankston City Council engaged ENGIE to undertake an end-of-life upgrade of the council’s Civic Centre DX cooling, heating and building controls systems. ENGIE was able to provide multi-technical services.
    ENGIE Solar Pilot Plant
    ENGIE Electrical and Communications HQ
    Fairfield, Melbourne
    The Solar Pilot Plant at ENGIE’s Fairfield headquarters was the first design & installation project for the newly created ENGIE Electrical and Communications team.
    David Jones Electrical Fit Out
    David Jones Corporate Campus Electrical Fit Out
    Burnley, Melbourne
    David Jones has relocated its central headquarters from Sydney to a purpose-built corporate campus for their iconic retailers David Jones and Country Road Group, in Melbourne’s fashion district.
    Orygen Audio-Visual Fit Out
    Orygen Audio-Visual Fit Out
    Melbourne, Victoria
    Orygen had a vision to create a state-of-the-art clinical, education, training and research space. ENGIE were engaged by Orygen in 2019 to complete the audio visual fit out at their new facility in Melbourne.
    Avalon International Airport Fitout
    Avalon International Airport Fitout
    Geelong, Victoria
    ENGIE helped Avalon Airport to become Victoria’s second international airport with a new $40m terminal catering for customs and security requirements of international flights, retail and duty-free space.
    Casey Hospital Expansion Project
    Casey Hospital Expansion Project
    Melbourne, Victoria
    A recent 13,000m² expansion of Casey Hospital enables provider Monash Health to treat 25,000 patients, perform an extra 8,000 procedures and support 1,300 births annually.
    Bravura Solutions Office Fitout
    Bravura Solutions Office Fitout
    Melbourne, Victoria
    When Bravura Solutions, a leading global supplier of software and professional services, needed a technology partner for their new Melbourne office, ENGIE was selected as the successful integrator.
    Bendigo Hospital
    Bendigo Hospital
    Bendigo, Victoria
    In 2013, the Victorian Government, in partnership with Exemplar Health and Bendigo Health, undertook a major $630 million project to build a new world class healthcare facility.
    Melbourne Airport Video Display Wall
    Melbourne Airport Video Display Wall
    Melbourne, Victoria
    ENGIE Services was employed to design and construct an 85 Metre 2.5mm pixel pitch LED video display wall, encompassing the baggage return carousel at Melbourne Airports International Baggage Claim No 8.
    Freshwater Place Digital Artwork Display
    Freshwater Place Digital Artwork Display
    Melbourne, Victoria
    ENGIE were engaged by JLL to create a Digital Artwork Display using LED to showcase immersive content and create a high tech but nature-driven aesthetic at one of Melbourne’s premier business addresses
    Wood & Grieve Engineers Office Refurbishment
    Wood & Grieve Engineers Office Refurbishment
    Melbourne, Victoria
    Wood & Grieve Engineers (WGE) are a leading multi-discipline building services engineering company and due to consistent growth came to market for their office refurbishment in late 2017.
    Monash University Moot Court
    Monash University Moot Court
    Melbourne, Victoria
    ENGIE Services was engaged by Monash University to integrate and commission the Audio Visual equipment for a Moot Court to the Monash eSolutions system designed by Peter MacLean.
    Alfred Health Centre For Health Innovation (CHI)
    Alfred Health Centre For Health Innovation (CHI)
    Melbourne, Victoria
    ENGIE was engaged by Alfred Health to deliver an AV upgrade to their Centre for Health Innovation (CHI), where clinical staff and students develop skills and practice procedures.
    Tabcorp High-Tech Office Fitout
    Tabcorp Melbourne Office
    Collins Street, Melbourne
    ENGIE was invited to provide a tender response for the Tabcorp Project. The brief was to provide a state-of the-art electrical services installation which met the direction provided by Tabcorp, JLL PDS, ECM & PTID.
    Fire Protection Across States: Murraylink Electricity
    Fire Protection Across States: Murraylink Electricity
    Red Cliffs, Victoria to Berri, SA
    Murraylink is a 180km long, high voltage direct current electricity transmission link between Red Cliffs in Victoria and Berri in South Australia, connecting the electricity grids of both states.
    Woodside Head Office Fitout
    Woodside Capital Square Tower 1
    Perth, WA
    Woodside had been at its Perth location since 2004 and given the age of the existing fit out, the company needed a state-of-the-art base to accommodate their requirements for the future.
    Optus Stadium Perth CCTV System Installation
    Optus Stadium Perth CCTV System Installation
    Burswood, Perth
    Perth’s Optus Stadium is a 60,000 seat, world class, multi-purpose stadium located east of the Perth CBD, on the Burswood Peninsula. ENGIE Services was engaged to install the state-of-the-art CCTV system.
    Four Seasons Hotel Sydney Boot Scheme Upgrade
    Four Seasons Hotel Sydney Boot Scheme Upgrade
    Sydney, NSW
    The Four Seasons Hotel Sydney Energy Efficiency Upgrade (BOOT Scheme) comprised the upgrade of the hotel’s mechanical plant room that dated back to 1981 – when the landmark hotel was built.
    Perth Children’s Hospital Communications System
    Perth Children's Hospital Communications System
    Nedlands, Perth
    When Schneider sought a new contractor to support their work during construction of the Perth Children’s Hospital, it provided ENGIE Services with the opportunity to take on a very large and complex project.